Bookkeeping
8 min readAll explainers

Weekly bookkeeping checklist — for subcontractors between draws.

A weekly bookkeeping cadence for subcontractors: Monday PO intake into QuickBooks, Wednesday AM bank rec against the prior week, Friday supplier-invoice 3-way match (PO → receiving report → supplier invoice), Friday afternoon client invoice run aligned to the GC draw, and the month-end close that locks the period and ships the P&L. Five recurring days that stop the books from drifting between draws.

Written by Johnston Admin Management Services LLC · Virginia HQ, U.S. nationwide.
Section 1

Monday morning PO intake

Monday PO intake is the first 20 minutes of the week, and the only step that the prior 5-day plan rolls into. Before any other work touches the inbox, every purchase order received from the GC the prior week lands in the schedule — PO number, GC entity, scope description, scheduled value, retainage percentage, and the job code that will bill against it. The cadence runs Monday because Friday afternoons tend to go off-rails enough that any PO intake work scheduled then slips; Monday morning is the only slot the inbox reliably clears before the rest of the week starts.

Three bookkeeping outputs flow from this step. (1) The PO opens a one-line A/R record on the job ledger so the draw forecast reflects the new unliquidated contract value. (2) The current supplier-invoice queue for that job is refreshed — any material order against the PO gets a placeholder for the 3-way match on Friday. (3) The next pay app cycle for the job is queued with the GC billing cutoff and the owner lender draw date stamped on it. Once those three outputs are filed, the week's work for that PO is a series of small bookkeeping tasks that each ship in minutes — none of them blocked by missing context.

Most subs can run this step standing-up with a coffee — 20-40 minutes per inbox week depending on the volume of POs received. The work is highly template'able: Constants for PO fields, a recurring Monday task cut from last week's, the same handful of jobs in rotation. We run this for subs who want the cadence locked into a Clockify-tracked schedule instead of a weekend project-manager pile-up.

Section 2

Wednesday AM bank reconciliation

Wednesday AM is the bank-rec slot. By Wednesday, the prior week is fully closed in the business bank and credit-card accounts — the day's activity has cleared, all supplier payments have posted, and any GC deposits from a Friday afternoon pay app have either cleared or are showing as pending in the statement. The reconciliation step ties each transaction (deposit, ACH, wire, card swipe, check, fee) to a job, a vendor, a customer, or an owner contribution. Unmatched transactions over $50 go on a one-line hold list, not on the books.

The cadence drives itself: a bank rec run every Wednesday means no transaction sits longer than 7 days without a job or a vendor attached. Find a 6-month-old mystery $480 transaction closed at "some Interchange" in the merchant descriptor and you'll spend half a day trying to identify it before the QBO bank-rec feed even loads. Find a 6-day-old identical transaction and the job site is still in your Friday memory.

The Wednesday AM hold list

Every unmatched bank transaction goes on a one-line hold list with the bank's posting date and the raw merchant descriptor — never on the books as a generic expense. The hold list is reviewed (or resolved) at the next 1:1.

  • Card swipes — usually a fuel stop, a supplier run to the yard, or a fleet service. Matched to the job's fuel/maintenance line.
  • ACH debits — payroll, supplier invoices, software subscriptions. Matched to vendor or category.
  • Deposits from GCs — tied to a specific pay app and PO. Confirms the draw landed.
  • Owner contributions / draws — tagged as equity / owner's draw, never as revenue.
  • Interchange / fee sweeps — payroll processor fees, card processing fees. Booked to a fees line, with the gross and the fee linked.
Section 3

Friday AM supplier-invoice 3-way match

Friday AM is the supplier-invoice slot — the 3-way match between PO, receiving report, and supplier invoice. By Friday, every supplier invoice that arrived during the week has been opened, date-stamped, and queued in the supplier-inbox folder. The batch runs end-to-end in one sitting — usually 45-90 minutes for 4-8 supplier invoices, depending on the scope of materials included.

The 3-way match is a fixed checklist. For every supplier invoice: (1) the PO in QuickBooks — confirm quantity × unit price matches the supplier invoice line; (2) the receiving report (a delivery ticket signed at the yard, or a field-tech note in the project management software) — confirm the received quantity matches what the supplier is now billing; (3) confirm the unit price on the supplier invoice matches the PO, and that no freight / fuel surcharge / restocking fee is hidden inside the invoice. Any of the three that does not match sends the invoice into a hold queue with a one-line note on the discrepancy. Mismatches don't get posted as "close enough."

PO review

Quantities and unit price

Pull the PO the supplier invoice was billed against. Confirm quantities on the invoice × unit price on the invoice = the line total. Confirm the unit price matches the PO — most supplier price drift starts here, and it almost always drifts UP on the invoice.

Receiving report

What actually arrived

The receiving report (yard delivery ticket or field-tech sign-off) is the only proof of what actually landed. Confirm the received quantity matches the supplier invoice. Short shipments billed as full, back-ordered items billed before delivery, and substitutions billed at a higher unit price all surface here.

Supplier invoice

Hidden surcharges

Confirm the unit price matches the PO. Look for embedded freight, fuel surcharges, restocking fees, and "small order" fees that the supplier quietly added at invoice time. Each line gets a yes/no on whether it was agreed to at PO time — anything that wasn't goes on the hold list, not into A/P.

Hold queue

Discrepancies, not "close enoughs"

A 3-way match that flags a $180 over-bill saves the sub working capital the first time it runs. Most subs find 1-2 supplier invoices per month with a real discrepancy when they start this batch honestly. Fix it at the source with the supplier, then post the corrected invoice.

Most of this step used to be a quarterly or month-end headache for subs who let the supplier-invoice inbox pile up. The Friday batch keeps the queue flat. We run this step inside the same A/P + bookkeeping cadence that ships the rest of the weekly template, with the same Clockify-tracked hours you'd see on any other monthly invoice line.

Section 4

Friday PM client invoice run (draw-aligned)

Friday PM is the client-invoice slot — A/R, not A/P. The day is split on purpose: supplier invoices (money OUT) in the AM close out the purchasing week, client invoices (money IN) in the PM start the billing cycle for the GC. By 4 PM Friday the pay apps going out the door have been drafted off the prior week's supplier confirmation, the current week's stored-materials status, and the contract-defined retainage math.

The Friday-pay-app cycle is draw-aligned, not calendar-aligned. Three dates drive when the pay app has to land. (1) The GC's billing cutoff, which is the date the pay app has to be in the GC's billing inbox to make the next draw — usually 3-5 business days before the lender draw date. (2) The owner lender's draw date, which is the date the GC's master G702 has to hit the construction-loan officer to actually trigger funding. (3) The sub's A/R follow-up cadence, which is the date the sub expects funds to actually hit the bank. Sequencing those three dates backwards from the lender draw gives the Friday-pay-app slot its calendar.

Friday PM — one pay-app checklist

Pull schedule of values + prior pay app from the job ledger.

Build G703 lines this period + to-date, apply retainage per contract.

Generate the conditional / unconditional waiver set for this draw.

Reconcile G703 → G702 totals so the GC billing desk gets a clean stack.

Submit the pay app 2-3 business days BEFORE the GC billing cutoff.

Section 5

Month-end close — reconcile, lock, prep

Month-end close is the one bookkeeping step that needs its own protected slot. If the rest of the weekly cadence ran, this step takes an afternoon — not a weekend, not a week. The five-line minimum close runs: (1) the bank-rec final pass for the closed month, with no unmatched transactions over $50; (2) the credit-card rec final pass, same rule; (3) all supplier invoices dated in the closed month posted in QuickBooks; (4) the P&L by job — top three jobs by revenue and margin, plus any job below the firm's break-even target; (5) the period lock in QuickBooks (close period, restrict edits) and the next month's PO + supplier queue prep.

The period lock is the under-appreciated line in any sub's books. Once the month is locked in QuickBooks, edits to closed-month transactions require an unlocking action — a deliberate review by an owner or admin before any change goes through. That's the discipline that catches the kind of mistakes that show up in audit or lender review: a posted invoice that wasn't 3-way matched, a misclassified labor charge on the wrong job, a manual journal entry that doesn't tie to a bank line.

The P&L by job is the line most subs skip — and the line that surfaces the largest bookkeeping findings. Job-level margin is the difference between signing the subcontract and walking away at next bid. Running the P&L by job monthly means every job ends with a clear "this one returned X% margin for Y days of work" record, and the bid-calculation template for the next project starts from real margin history, not from vibes. We run this on a Clockify-tracked cadence for subs who want the books and the bid math on the same calendar.

FAQ

Frequently asked questions.

Why bookkeep weekly instead of just catching up at month-end?

Monthly catch-up bookkeeping for a working sub drifts in two places: the bank rec and the supplier-side A/P. By the time the month closes, the inbox has 60+ supplier invoices to 3-way match against receiving reports and POs — most of them unfiled because nobody logged them when they arrived — and the bank statement has 80+ transactions that nobody tied back to a job or a vendor. The weekly cadence catches both before they pile up. Bank rec by Wednesday AM of the week after means every transaction is matched within 7 days; Friday supplier-invoice batches stay at 4-8 documents instead of 60. The month-end close then takes an afternoon instead of a sprint.

What's in Monday's PO intake step?

Three things, before any other work touches the inbox. (1) Open the email/builders-risk inbox and capture every PO received from the GC the prior week into the schedule — PO number, GC entity, scope description, scheduled value, retainage %, and job code. (2) Push a one-line A/R record onto the job ledger so the draw forecast reflects the new unliquidated contract value. (3) Queue the bookkeeping tasks for the new job: weekly bank-rec line items, the next supplier-invoice batch for materials ordered against it, the next client invoice aligned to the project draw cadence, and the month-end close line for the project. Starting Monday with this step means the rest of the week runs on a job-by-job queue that is never more than seven days stale.

How does the Friday supplier-invoice 3-way match (PO → receiving report → supplier invoice) actually run?

For every supplier invoice in the current-week batch: (1) find the PO in QuickBooks, confirm quantity × unit price matches the supplier invoice line; (2) find the receiving report (or delivery ticket signed at the yard), confirm the received quantity matches what the supplier is now billing; (3) confirm the unit price on the supplier invoice is the same as the PO, and that no freight / fuel surcharge / restocking fee is hidden inside the invoice. If any of the three does not match, the invoice goes into a hold queue with the discrepancy written on it. A 3-way match that correctly flags a $180 over-bill avoids a working-capital leak — most subs find one or two bad supplier invoices per month the first time they run this batch honestly.

What's different about the Friday client-invoice run vs. the supplier-invoice batch?

Direction: the supplier-invoice batch is money OUT, the client-invoice run is money IN. Friday afternoon is client invoice (A/R) because it has to be draw-aligned — the GC billing cutoff and the owner lender draw date drive the date the pay app has to land on the GC desk, not the calendar. The Friday-afternoon client invoice pulls the current week's completed work and stored materials from the job ledger, applies the retainage from the contract (not the AIA 10% default), pairs the conditional/unconditional lien-waiver set for the draw, and ships the pay app 2-3 business days BEFORE the GC cutoff so it makes the current draw. Missing the draw by one day pushes the working capital out 30 days.

What's the minimum month-end close checklist for a sub?

Five-line minimum that any sub can run in an afternoon. (1) Finish the bank rec for the closed month — every transaction tied to a job, a vendor, or an owner contribution; an unresolved balance over $50 is an item to investigate, not to write off. (2) Reconcile the credit-card statements to the month, same rule. (3) Confirm all supplier invoices dated in the closed month are posted (no accrual-only entries for unposted invoices). (4) Run the P&L by job — top three jobs by revenue, top three by margin, and any job whose margin is below the firm's break-even target. (5) Lock the period in QuickBooks (close period, restrict edits), then prep next month's PO and supplier queue from the Monday of the new month. Anything that doesn't fit those five steps becomes a one-line carry-forward note that resolves inside the next month.

TL;DR

The 30-second version.

  • Monday PO intake opens the week — every PO received last week lands in the job ledger, A/R, and the supplier + client-invoice queue for the new scope.
  • Wednesday AM bank rec catches every transaction within 7 days; mismatches over $50 go on a one-line hold list, not into the books.
  • Friday AM supplier-invoice 3-way match (PO → receiving report → supplier invoice) — 4-8 invoices per batch when the cadence stays flat, 60+ when it piles up.
  • Friday PM client invoice run is draw-aligned, not calendar-aligned — backwards from the GC's billing cutoff and the owner lender draw date so the pay app makes the current draw.
  • Month-end close: bank rec final pass, card rec final pass, supplier invoices all posted, P&L by job, period lock + next-month queue prep. One afternoon, not a weekend.
Who this helps

For subcontractors.

Keep books, pay applications, and draw support aligned with a weekly close so the next billing cycle starts from clean numbers.

Explore support for subcontractors
Send the PO and the timer starts

Stop letting the books drift between draws. Lock the cadence in one inbox handoff.

Drop the contracts, POs, and the last three months of bank and supplier documentation in the inbox and we'll stand up the Monday / Wednesday / Friday cadence on a Clockify timer the same week — at $45/hour, billed to the exact minute, every minute visible on the invoice before the line amount is ever printed.

$45/hour · Clockify-tracked · billed to the exact minute
Read next
Subcontractors

The paperwork that costs subs the most.

Construction bookkeeping for subcontractors: pay apps, lien-waiver prep, and the cash-flow gap that bleeds working capital between draws.

Services

The full service menu — $45/hour, billed to the minute.

Pay apps, lien waivers, A/R follow-up, virtual bookkeeping — Clockify-tracked, exact-minute billing, no minimums. One rate, one time trail.