Blog

Construction admin, explained — for GCs and their subs.

Long-form explainers on the paperwork that pays subcontractors on time: AIA G702/G703 pay applications, conditional vs. unconditional lien waivers, A/R follow-up cadence, virtual bookkeeping, and the schedule-of-values reconciliation that decides whether the next draw clears on the cadence your contract set.

One new explainer every few weeks.
Latest explainers

The paperwork that pays subs on time.

Each explainer walks through one slice of construction admin — what the form is, when it ships, where waivers fit, and the mistakes that stall the bill on the GC's desk. Read the post, then send the PO if you want the work run on a $45/hour Clockify-tracked rate.

What G702 and G703 actually are, when subs file them, where conditional and unconditional lien waivers fit in the monthly billing cycle, the six mistakes that stall pay apps on the GC's desk, and how we run the paperwork at $45/hour, billed to the minute.

Read the explainer

A five-day cadence that stops the books from drifting between draws: Monday PO intake, Wednesday AM bank rec, Friday AM supplier-invoice 3-way match, Friday PM draw-aligned client invoice run, and the month-end close that locks the period and ships the P&L.

Read the explainer

What retainage is in construction — the portion of every progress payment the GC holds back until a project milestone — how the typical 5-10% holdback mechanics run on AIA G702/G703 pay applications, when retainage must be released under common state rules, how to track it on the G703 schedule-of-values and the G702 retainage-to-date line, and how to pair the final retainage release with a conditional vs. unconditional lien waiver.

Read the explainer

What a bank draw schedule actually is on a custom home build — the construction-loan disbursement cadence, the AIA G702/G703 pay app, the lender inspection, the 5-10 business-day timing window, the four paperwork mistakes that stall disbursements (missing lien waivers, incorrect G703 line items, premature percentages, no inspection prep), and how admin support keeps every draw on cadence.

Read the explainer

What a CA handoff package really is — the four named logs (RFI, ASI, submittal, plan distribution) plus the spec set and contact list — the typical 1-3 week cadence before deliverables start landing, how to delegate the inbox churn without dropping deadlines, what week-1 admin support looks like in practice, and how the per-hour Clockify-tracked handoff runs at $45/hour to the exact minute.

Read the explainer

What a Certificate of Insurance must list for a GC to accept it — additional-insured endorsements, primary-and-non-contributory wording, waiver of subrogation, per-occurrence and aggregate limits matching the subcontract — the common ACORD 25 mistakes that bounce a submittal, when a builders-risk or umbrella rider is required, and how admin support keeps the COI master log current against policy renewals.

Read the explainer

How to build a 13-week rolling cash-flow forecast from open pay applications, retainage holdbacks, and upcoming draw dates — how to spot a payroll gap before it hits, the forecasting mistakes that distort the numbers (double-counting pending draws, ignoring lien-waiver delays, treating retainage as liquid), and how admin support keeps inputs current at $45/hour billed to the minute.

Read the explainer

A pre-signature audit for incoming G702 applications: reconcile G703 line items to the schedule of values, verify period dates against the contract calendar and billing cutoff, pair lien waivers with payment status, cross-check certified payroll, and prove retainage math before the draw goes to the owner.

Read the explainer
Owner-builder operations
9 min read

How owner-builders align the schedule of values, purchase orders, invoices, lien waivers, and retainage so each custom-home draw is ready to clear — plus the first-30-days tracker and month-end reconciliation that make targeted admin support pay for itself.

Read the explainer

How an incoming change order changes the approved SOV baseline, current-period billing, remaining balance, and retainage — when redistribution is required, when a log entry is enough, and which scope, line-item, and retainage flags to catch before the GC signs.

Read the explainer

The fields every architect’s submittal log needs — submittal number, spec-section reference, product data sheet, status code, and due-back date — how a current queue protects the 14-day review turnaround, why the spec reference prevents shop-drawing drift, and how admin support reconciles the master register against returned drawings.

Read the explainer
Read the explainer, then send the PO

From the blog post to the first Clockify minute.

Drop the contract or scope and we'll start a Clockify timer for the first pay-app task the same day — the explainer above matches how the work actually runs on our invoice line.